Table A1 Monthly base charge–users within corporate limits.
Meter Size
| Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 |
Meter Size
| Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 |
Five-eighths inch | $5.92 | $6.69 |
One inch | $15.15 | $17.14 |
One and one-half inches | $34.08 | $38.55 |
Two inches | $60.58 | $68.53 |
Three inches | $136.32 | $154.20 |
Four inches | $242.33 | $274.13 |
Six inches | $545.25 | $616.79 |
Table A2 Monthly base charge–users outside corporate limits.
Meter Size | Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 |
Meter Size | Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 |
Five-eighths inch | $8.87 | $10.04 |
One inch | $22.72 | $25.70 |
One and one-half inches | $51.13 | $57.84 |
Two inches | $90.87 | $102.80 |
Three inches | $204.48 | $231.31 |
Four inches | $363.50 | $411.20 |
Six inches | $817.87 | $925.19 |
JCRSD | TBD | TBD |
(1) The monthly sanitary sewer minimum charge for any property that has more than one unit will be based upon the total number of units times the rate listed in Tables A1 and A2 above, consistent with the property type.
(2) The monthly sanitary sewer charge will be pro-rated on the first and last bills of an occupier and based on the number of days being billed.
(1987 Code, § 9-69) (Ord. passed 6-26-2000; Am. Ord. 13, 2001, passed 5-14-2001; Am. Ord. 22, 2001, passed 8-27-2001; Am. Ord. 17, 2014, passed 5-12-2014; Am. Ord. 12, 2021, passed 4-12-2021)
Table B Trash pick-up and recycling charge.
(1) The monthly trash and recycling pick-up charge shall be as follows.
Location of User | Monthly Trash Pick-Up Charge | |
Within the corporate limits | $5 as of June 1, 2021 | $7 as of June 1, 2022 |
(2) The minimum monthly trash and recycling charge for any apartment building or other multi- family residential structure shall be based upon the total number of residential units in that structure.
(3) The monthly trash and recycling charge will be charged whether the property is being occupied or vacant.
(4) The minimum trash and recycling charge will be pro-rated on the first and last bills of an occupier and based on the number of days being billed.
(1987 Code, § 9-69) (Ord. passed 6-26-2000; Am. Ord. 13, 2001, passed 5-14-2001; Am. Ord. 5, 2002, passed 3-11-2002; Am. Ord. 17, 2014, passed 5-12-2014; Am. Ord. 13, 2021, passed 4-12-2021)
Table C Sanitary sewer rates for metered users.
Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 | |
Rate per 100 cubic feet within corporate limits | $4.82 | $5.46 |
Rate per 100 cubic feet outside corporate limits | $7.24 | $8.19 |
Within corporate limits at 4,000 gallons | $31.72 | $35.88 |
Outside corporate limits at 4,000 gallons | $47.61 | $53.86 |
(1987 Code, § 9-69) (Ord. passed 6-26-2000; Am. Ord. 13, 2001, passed 5-14-2001; Am. Ord. 17, 2014, passed 5-12-2014; Am. Ord. 14, 2019, passed 8-12-2019; Am. Ord. 12, 2021, passed 4-12-2021)
Table D Monthly sanitary sewer rates for unmetered users.
Phase I, Effective June 1, 2021 | Phase II, Effective June 1, 2022 | |
Commercial or industrial | $60.77 | $68.74 |
Within corporate limits (residential) | $44.50 | $50.34 |
Outside corporate limits (residential) | $66.75 | $75.51 |
(Am. Ord. 17, 2014, passed 5-12-2014; Am. Ord. 18, 2021, passed 5-24-2021)
(E) Strength-of-wastes surcharge rates. The rate of surcharges for specific constituents in quantities beyond the limits as given in § 50.210 shall be as follows.
Constituent | Surcharge Rate (Per Pound) | |
Within Corporate Limits | Outside Corporate Limits | |
Ammonia | $0.24 | $0.36 |
Biochemical oxygen demand (BOD) | $0.24 | $0.36 |
Phosphorus | $0.24 | $0.36 |
Suspended solids | $0.24 | $0.36 |
(1987 Code, § 9-80)
(Ord. passed 6-26-2000; Am. Ord. 13, 2001, passed 5-14-2001; Am. Ord. 17, 2014, passed 5-12-2014)
(F) Construction, connection, inspection, and monitoring fees.
Activity | Details | Fee | 2003 Code | 1987 Code | Ord. No. | Date Passed |
Activity | Details | Fee | 2003 Code | 1987 Code | Ord. No. | Date Passed |
Connection to interceptor or extension, in the city | $100 surcharge | 50.025 | 9-130 | - | 6-26-2000 | |
Connection to interceptor or extension, in the city | During interceptor construction | $75 surcharge | 50.025 | 9-130 | - | 6-26-2000 |
Connection to municipal sewer, outside city limits | $250 surcharge | 50.026 | 9-131 | - | 6-26-2000 | |
Connection to municipal sewer, outside city limits | Waiver of right to protest annexation | Surcharge as for in-city connection | 50.026 | 9-131 | - | 6-26-2000 |
Individual additional lot connection to subdivision sewer | Subdivision system connected to municipal sewer | $5 inspection fee | 50.027 | 9-133 | - | 6-26-2000 |
Private sewage disposal system | Permit and inspection fee | $5 | 50.066 | 9-120 | - | 6-26-2000 |
Tap-on fee | Each new connection | $100 | 50.209 | 9-77.2 | - | 6-26-2000 |
Wastewater treatment system; inspection and monitoring | Industrial discharger disclosure form | $50 | 50.195 | 9-19 | - | 6-26-2000 |
(Am. Ord. 17, 2014, passed 5-12-2014)