§ 50.031 MATERIALS AND METHODS OF CONSTRUCTION.
   The size, slope, alignment, and materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
(1987 Code, § 9-137) (Ord. passed 6-26-2000)