Required for each dwelling unit is water in sufficient quantity according to the following requirements.
(A) If connected to a public or private water company that provides culinary water, a letter from the water company stating it will provide the necessary culinary water connection for the dwelling unit is required to obtain a building permit.
(B) If culinary water is to be provided from a well, one acre foot (.0037cfs) of water is required for each dwelling unit. This water right must be in the name of the building permit applicant and assigned by the State Division of Water Rights to the building lot.
(Ord. 2024-5-3, passed 5-13-2024)