(A)
The applicant shall be responsible for the installation and design of the facility to be installed within the right-of-way. The town will only be responsible for the review and approval of the proposal with respect to the locations of the facilities to be installed and the manner of installation. Approval of the permit does not relieve the applicant of responsibility for the design.
(B) The town does not alter current regulations or authority for installing utility facilities nor for determining financial responsibility for replacing or adjusting utility facilities. The town limits itself to matters which preserve the safe operation, maintenance, and integrity of the town’s rights-of-way.
(Ord. 2021-03, passed 10-12-2021; Ord. 2023-03, passed 5-9-2023)