§ 54.021 ADDITIONAL PRETREATMENT MEASURES.
   (A)   Whenever deemed necessary, the Wastewater Utility Superintendent may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams and other conditions as may be necessary to protect the POTW and determine the user's compliance with the requirements of this chapter.
   (B)   The Wastewater Utility Superintendent may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization.
   (C)   Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter.
(`93 Code, § 9-155) (Ord. 1994-601, passed 9-26-94)