§ 54.020 PRETREATMENT FACILITIES AND GREASE TRAPS.
   (A)   Users shall provide wastewater treatment as necessary to comply with this chapter and shall achieve compliance with all categorical pretreatment standards, local limits and the prohibitions set out in § 54.005 within the time limitations specified by EPA, the state or the Wastewater Utility Superintendent, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated and maintained at the user's expense. Detailed plans describing the facilities and operating procedures shall be submitted to the Wastewater Utility Superintendent for review, and shall be acceptable to the Wastewater Utility Superintendent before the facilities are constructed. The review of the plans and operating procedures shall in no way relieve the user from the responsibility of modifying the facilities as necessary to produce a discharge acceptable to the town under the provisions of this chapter.
   (B)   Specific to facilities subject to oil and grease discharge or potential of discharge, the facility shall install a grease trap with a minimum capacity of 1,000 gallons. Notification prior to installation shall be made to the Wastewater Utility Superintendent. Additionally, the facility shall obtain all necessary local and state construction permits prior to installation. Individual traps shall be maintained to ensure proper operation and, at a minimum, be cleaned and pumped once every 60 days.
(`93 Code, § 9-154) (Ord. 1994-601, passed 9-26-94)