(A) Calculation of land disturbance should follow the guidelines discussed in § 55.042.
(B) The calculation methods as well as the type, sizing, and placement of all stormwater quality management measures, or BMPs shall meet the design criteria, standards, and specifications outlined in the Town of Sellersburg Stormwater Technical Standards Manual. The methods and procedures included in the referenced standards is in keeping with the above stated policy and meet the requirements of IDEM’s Rule 13.
(Ord. 2021-OR-003, passed 1-11-21)