(A) After the pipe has been laid and properly bedded and inspected and approved by the Inspector, the trench may be backfilled with loose soil.
(B) Large rocks, concrete, stumps, roots and other debris should not be used in the backfilling process.
(`93 Code, § 7-58) (Ord. 92-526, passed 4-27-92)