§ 53.076 INSPECTIONS.
   (A)   A pre-inspection is required when the service lateral of the property line has been exposed to insure that the service lateral stub has not been damaged.
   (B)   A post inspection will be made after all pipe has been laid and prior to any backfilling of the new sewer line from the house.
   (C)   The inspections must be scheduled with the Inspector at least 24 hours in advance.
(`93 Code, § 7-56) (Ord. 92-526, passed 4-27-92)