§ 54.43 PERMIT CONDITIONS.
   (A)   Wastewater discharge permits shall be expressly subject to all sections of this chapter and all other applicable regulations, users’ charges, and fees established by the city.
   (B)   Permits may contain the following:
      (1)   The unit charge or schedule of user charges and fees for the wastewater to be discharged to a community sewer;
      (2)   Limits on the average and maximum wastewater constituents and characteristics;
      (3)   Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization;
      (4)   Requirements for installation and maintenance of inspection and sampling facilities;
      (5)   Specifications for monitoring programs which may include sampling locations; frequency of sampling; number, types, and standards for tests; and reporting schedule;
      (6)   Compliance schedules;
      (7)   Requirements for submission of technical reports or discharge reports as required in § 54.46;
      (8)   Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city, and affording city access thereto;
      (9)   Requirements for notification of the city or any new introduction of wastewater constituents or any substantial change in volume or character of the wastewater constituents being introduced into the wastewater treatment system;
      (10)   Requirements for notification of slug discharges as per § 54.46; and
      (11)   Other conditions as deemed appropriate by the city to ensure compliance with this chapter.
(Ord. 02-03, passed 7-15-2002)