(A) All construction debris and demolition debris must be removed using an approved method. Approved methods shall be limited to:
(1) Arrangements with a licensed contractor; and
(2) Transport of an individual’s or establishment’s own material to a city-designated disposal facility.
(B) All special refuse must be removed using an approved method. Approved methods shall be limited to:
(1) Arrangements with the licensed and contracted city refuse hauler, provided appropriate refuse tags are affixed;
(2) Arrangements with a licensed contractor or refuse hauler; and
(3) Transport of an individual’s or establishment’s own material to a city-designated disposal facility.
(1993 Code, § 50.08) (Ord. 90-4, passed 8-20-1990) Penalty, see § 50.99