Typical cross sections must be provided at one hundred (100) foot increments showing all existing and proposed channels or other open drainage facilities carried to a point above the 100-year high water elevation; showing the elevation of the existing land and the proposed changes thereto, together with the high water elevations expected from the 100-year storm under the controlled conditions called for by this ordinance, as amended from time to time, and showing the relationship of structures, streets, and other facilities.
(Ord. No. 1708, 6-13-07)