(A) Utility lines including, without limitation, electrical, telephonic, street, and cable television must be placed underground within all new subdivisions.
(B) All underground construction must be installed before the streets are paved if such construction occurs within streets and requires open excavation of the street surface. All construction must be performed to the satisfaction of the Engineer and in accordance with city standards.
(Ord. 1102, passed 6-7-04)