(A) An accurate and complete field survey of the land to be subdivided must be made by a registered civil engineer or licensed land surveyor authorized to practice land surveying in the State of California. All monuments, property lines, centerlines of streets, alleys and easements adjoining or within the subdivision must be tied into the survey. The allowable error of closure on any portion of the final map must not exceed 1/10,000 for field closures and 1/20,000 for calculated closures.
(B) At the time of making the survey for the final map, the engineer or surveyor must set sufficient durable monuments to conform with the standards described in Cal. Bus. & Prof. Code § 8771 so that another engineer or surveyor may readily retrace the survey. At least one exterior boundary line must be monumented before recording the final map. Other monuments must be set as required by the Engineer.
(Ord. 1102, passed 6-7-04)