(A) All manufactured slopes, other than those constructed in stable bedrock, must be planted or otherwise protected from the effects of stormwater runoff erosion within 30 days of the creation of the slope. Planting must be designed to blend the slope with the surrounding terrain and development in terms of coverage, color, and type of plant material. An irrigation system must be provided and maintained to ensure proper maintenance of landscaped slopes.
(B) Manufactured slopes in stable bedrock must be provided with landscaped soil pockets, with the landscaping to consist of plant materials designed to blend the slope with the surrounding terrain and development in terms of coverage, color, and type of plant material. An irrigation system must be provided and maintained to ensure proper maintenance of landscaped slopes.
(C) Landscaping and irrigation plans for such slope planting must be submitted and approved by the Planning Director and City Engineer prior to the issuance of building permits. All such slopes must be planted and provided with irrigation systems prior to the issuance of occupancy permits.
(Ord. 1100, passed 7-6-04)