In addition to the information required in this chapter, every application for a parade will include the following information:
(A) The time when units of the parade will begin to assemble;
(B) The proposed assembly point for the parade;
(C) The proposed parade route;
(D) The interval space to be maintained between units of the parade; and
(E) The number, types and size of floats.
(Ord. 1129, passed 12-20-04)