(A) The total flow of industrial wastewater discharged by the industrial user must be measured by the Director by means of:
(1) A metering device, approved by the Director and obtained, installed, and maintained at the expense of the user; or
(2) Estimate determined from total water used in the area occupied by the user.
(B) The Director must select the method to be used unless the discharger can demonstrate that another method will more accurately represent the discharge.
(Ord. 1093, passed 2-17-04)