§ 155.796 REQUIRED ALTERATIONS.
   The Commission may require modifications or alterations in the existing or proposed construction or the operational procedures to insure that compliance with the performance standards will be maintained. The operator shall be given a reasonable length of time to effect any changes prescribed by the Commission for the purpose of securing compliance with the performance standards.
('64 Code, § 75.06)