13.08.100: METERING:
   A.   Installation: The department will furnish and install the necessary meter or meters, and the customer shall provide and maintain locations for installation thereof free of expense and satisfactory to the department.
   B.   Evidence Of Service Use: The registration of the department's meter shall be accepted and received at all times and places as prima facie evidence of the amount of power and energy taken by the customer.
   C.   Voltage Of Installation: Metering will be at secondary voltage unless otherwise specified in the service agreement.
   D.   Meter Tests And Bill Adjustments:
      1.   When the accuracy of a meter is questioned, upon written request from the customer, the department will test the meter by comparing with a standard test meter. If the meter is found to be accurate within plus or minus two percent (±2%), the customer will reimburse the department for the cost of said test. Prior to any test, the department reserves the right to require a deposit to cover said costs.
      2.   If the meter being tested is found to be more than two percent (2%) slow or fast, no charge shall be made for testing, and the department will adjust the proportion to the error (either fast or slow) for the period covered by the billing in question and until the date of installation of a new meter, but said adjustment period, in any event, shall not exceed ninety (90) days. (Ord. 1989-1 § 1: prior code § 14-319)