(A) A building permit shall be required for the construction of any sign, except as specified in sections below.
(B) The permit application shall include a map or plat and drawings showing the location, size, shape, type of illumination, and manner of installation of the proposed sign.
(C) The permit shall be filed with the Planning Department. The City Manager or designee may require that changes be made in the design of the sign as necessary to conform to the design criteria in § 154.275.
(D) Any person may appeal the decision of the City Manager or designee pursuant to § 154.028.
(Ord. 2021-03, passed 12-7-2021)