Applications for telecom facilities shall be accompanied by the following documentation as deemed necessary and, in such form, as required by the city and as may be described in the wireless telecommunications permit application packet:
(A) Project description summary; and
(B) Project characteristics;
(1) Project/site operational characteristics and features (including site plan, elevations, and project details);
(2) Project purpose;
(3) Significant gap of coverage maps;
(4) FCC license/FAA compliance;
(5) Radio frequency (RF) compliance report;
(6) Project photographs and photo-simulations;
(7) Structural safety report (including wind load calculations);
(8) Alternative candidate sites;
(9) Cultural resource report (as needed);
(10) Biological resources report (as needed); and
(11) Mature/protected trees report (as needed).
(Ord. 2021-03, passed 12-7-2021)