§ 99.04  DIVERSION REQUIREMENT.
   It is required that at least 50% of waste tonnage from demolition or existing construction such as addition, alteration, or repair projects (existing construction) shall be diverted from disposal.
(Ord. 13-103, passed 6-5-2013)