Simultaneously with the annual report required by § 112.075 of this subchapter, the grantee shall submit to the grantor an annual plant survey report which shall be a complete survey of the grantee's plant and a full report thereon. The report shall include, but not be limited to, a description and as-built maps of the portions of the franchise area which have been cabled and have all services available, and appropriate engineering evaluations, including suitable electronic measurements conducted in conformity with such requirements, including supervision, as the grantor may prescribe. The report shall be in sufficient detail to enable the grantor to ascertain that the service requirements and technical standards of the FCC and/or the franchise are achieved and maintained. At the grantor's request, but no more often than once every three years, the grantee and grantor shall agree upon the appointment of a qualified independent engineer to evaluate the technical performance of the cable system. The cost of such evaluation shall be borne by the grantee.
('65 Code, § 7-8.1302) (Ord. 244-C.S., passed - - ) Penalty, see § 112.999