(A) All construction and maintenance work shall be done in a manner designed to leave the area clean of earth, dust and debris and in a condition as nearly as possible to that which existed before such work began. As the excavation progresses, all public places shall be maintained free of all rubbish, excess earth and dust, rock and other debris resulting from such works. All cleanup operations at the location of such excavation shall be accomplished at the expense of the permittee. When ordered by the Administrative Authority, and in any event, immediately after completion of the work, the permittee shall clean up and remove all refuse within 24 hours after having been notified. Said work may be done by the Administrative Authority and the cost thereof charged to the permittee.
(B) If excavation through any landscaped area is necessary, the permittee shall, after the excavation has been backfilled, substantially restore the landscaping to its original condition. The permittee shall not remove, even temporarily, any existing trees or shrubs without first obtaining the consent of the Administrative Authority.
('65 Code, § 7-3.21) (Ord. 349-C.S., passed - - ) Penalty, see § 10.99