The permittee shall backfill the excavation in a manner which is satisfactory to the Administrative Authority as required in the permit, consolidating the material to enable the public place to be restored to a condition at least equivalent to that prior to the excavation. When required, soil tests certified by a registered professional specializing in soils engineering are to be furnished by the permittee. Prior to resurfacing, tests when required must show that the backfill material meets the minimum requirements as prescribed by the Administrative Authority. The permittee may be required to bear the expense of such tests.
('65 Code, § 7-3.19) (Ord. 349-C.S., passed - - ) Penalty, see § 10.99