§ 150.084 GENERAL REQUIREMENTS.
   (A)   The owner of each building within the scope of this subchapter shall cause a structural analysis to be made of the building by a civil or structural engineer or architect licensed by the State of California, and if the building does not meet the minimum earthquake standards specified in this subchapter, the owner shall cause it to be structurally altered to conform to such standards or cause the building to be demolished.
   (B)   The owner of a building within the scope of this subchapter shall comply with the requirements set forth above by submitting to the Department for review within the stated time limits:
      (1)   Within 270 days after the service of the order, a structural analysis. Such analysis, which is subject to approval by the Department, shall demonstrate that the building meets the minimum requirements of this subchapter;
      (2)   Within 270 days after the service of the order, the structural analysis and plans for the proposed structural alterations of the building necessary to comply to the minimum requirements of this subchapter;
      (3)   Within 120 days after service of the order, plans for the installation of wall anchors in accordance with the requirements specified in § 150.087(C); or
      (4)   Within 270 days after service of the order, plans for the demolition of the building.
   (C)   After plans are submitted and approved by the Department, the owner shall obtain a building permit, commence and complete the required construction or demolition within the time limits set forth in § 2 of the appendix following this chapter. These time limits shall begin to run from the date the order is served in accordance with § 150.085(A) and (B).
   (D)   Owners electing to comply with division (B)(3) of this section are also required to comply with divisions (B)(2) or (4) of this section; provided, however, that the 270 day period provided for in such divisions (B)(2) and (4) and the time limits for obtaining a building permit, commencing construction and completing construction for complete structural alterations or building demolition set forth in § 2 of the appendix following this chapter shall be extended in accordance with § 3 of the appendix following this chapter. Each such extended time limit, except the time limit for commencing construction, shall begin to run from the date the order is served in accordance with § 150.085(B). The time limit for commencing construction shall commence to run from the date the building permit is issued.
('65 Code, § 8-15.05) (Ord. 321-C.S., passed - - ) Penalty, see § 10.99