935.11 POST-CONSTRUCTION MAINTENANCE OF STORM WATER MANAGEMENT PRACTICES.
   (a)   Maintenance of Storm Water Management Practices.
      (1)   The Director of Engineering Services and Law Director shall approve an Inspection and Maintenance Agreement binding on the site owner and all subsequent owners of land served by the planned storm water management practices before the Community accepts the final plat of the proposed project.
      (2)   All inspection and maintenance agreements shall contain the following:
         A.   Designate the party responsible for maintenance of structural and nonstructural storm water management practices including mowing and ensuring outlet structures are clear and in good repair. Unless otherwise approved by the Community, this shall be an entity of common ownership within the proposed subdivision or the owner of an industrial or commercial site.
         B.   Prohibit unauthorized alterations of structural and nonstructural storm water management practices.
         C.   The Community may, at any time, in writing, require a time frame in which to address any maintenance needs of a storm water management control practice and/or an increase to inspection and maintenance requirements.
         D.   Parties responsible for the inspection and maintenance of storm water management facilities shall make records available to the Community during inspections and at other reasonable times upon request.
         E.   Provide easements for access to storm water management practices for inspection by the Community to document the condition of the practices.
      (3)   Whenever feasible, the location, dimensions, and bearing (including the depth of capacity) of all storm water management practices shall be incorporated on the final plat, prior to approval by the Community, and reference thereon shall be made to the entity or individual(s) responsible for maintenance.
      (4)   An as-built survey must be completed by qualified registered engineer or surveyor and submitted to the Community showing the location, detention volume (include depth and capacity) of all storm water practices within time period specified by the Director of Engineering Services.
         (Ord. 14-082. Passed 7-14-14.)