(a) Electric, cable television, natural gas and telephone service lines shall be provided within each subdivision.
(b) Telephone, natural gas, electric, and street lighting wires, conduits, and television cables shall be constructed underground except in cases where the Department of Engineering Services determine that topographic, bedrock, or underground water conditions would result in excessive costs to the subdivider or that long-term operational and maintenance costs will be excessive. All transformer boxes shall be located so as not to be unsightly or hazardous to the public and in locations approved by the Department of Engineering Services and Utility Company.
(c) All drainage and underground utility installations, which traverse privately owned property, shall be located in easements approved by the Department of Engineering Services.
(Ord. 02-176. Passed 10-28-02.)