1183.10 WATER SUPPLY.
   (a)   Water supply improvements shall be installed by the subdivider in conformance with the Engineering Design and Construction Standards.
   (b)   Water mains shall have a diameter of at least eight (8) inches.
   (c)   Service line connections shall be provided for each lot from the water line to the edge of the public right-of-way as approved by the Department of Engineering Services.
   (d)   Hydrants shall be installed by the subdivider in conformance with the Engineering Design and Construction Standards and as approved by the Department of Engineering Services and the Fire Department of the City of Sandusky.
   (e)   Water main extensions shall be installed by the subdivider to the farthest point of the last lot being served by such water main except that, when extending across a corner lot, the main shall be extended into or across the intersecting right-of-way or easement to a point determined by the Department of Engineering Services.
   (f)   Water mains shall be installed in a manner that will permit supplying all points from two (2) directions unless otherwise approved by the Department of Engineering Services.
   (g)   Valves shall be installed at intervals not exceeding one thousand (1,000) feet along water mains and at each leg of intersecting mains unless specified as otherwise in the Engineering Design and Construction Standards.
   (h)   The Department of Engineering Services may require that the subdivider install water mains larger than the adequate design required for the water demands of the subdivision itself, however, any such requirement and agreement to pay for such additional requirement with City funds shall only be made with approval of the City Commission.
(Ord. 02-176. Passed 10-28-02.)