933.15 COMPUTATION OF CONNECTION CHARGES
   (a)   Connection charges shall be computed as follows in Fee Schedule “B”, which is also included in duplicate in Section 939.03 (Setting Tap Charges):
Water Only Meters
 
Water Meter Size
Equivalent Size
Meter Fee
Double Yoke
W4 Hood & Tile
Total*
5/8"
1
$168.35
$367.42
$322.68
$858.45
3/4"
2
$189.14
$397.71
$372.71
$959.55
1"
3
$247.98
$574.69
$372.71
$1,195.38
1 ½"
4
$1,622.12
$1,622.12
Notice: All connections will require Plumbing Permits and Excavation permits. Plumbing permit cost varies and may be obtained by a registered contractor or homeowners occupying their own structure. Excavation permit costs are $85.00 per trench and may be obtained by a Licensed Excavator only.
FLOW RATES
Meter size
GPM
Sewer Deduct Meter (Sprinkler/Pool Filling)
5/8"
25
Residential - Cost of the Meter
Plumbing Permit $64.00 +
    1%BBS Fee = $64.64
3/4"
35
Commercial - Cost of the Meter
Plumbing Permit $100 +
3%BBS Fee = $103.00
1"
55
1 ½"
compound
100
1 ½"
compound
200
2"
160
2"
compound
200
3"
compound
500
4"
compound
1000
Account#’s
6"
compound
2000
Water Tap 612-0000-45271
3"
turbo
650
Water Meter 612-0000-45270
4"
turbo
1250
Sewer Conne 613-0000-45070
6"
turbo
2500
8"
turbo
3500
10"
turbo
5500
16"
turbo
10000
   Connection charges shall be increased by three percent (3%) each subsequent calendar year starting on January 1, 2022. Thereafter, this annual Connection Charge increase shall take effect on the first of January each successive year. The City Engineer shall update the rates charged annually to reflect this increase. A current version of the rates charged will be on file in the office of the City Engineer. (Ord. 20-195. Passed 12-28-20.)