(a) Connection charges shall be computed as follows in Fee Schedule “B”, which is also included in duplicate in Section 939.03 (Setting Tap Charges):
Water Only Meters
Water Meter Size | Equivalent Size | Meter Fee | Double Yoke | W4 Hood & Tile | Total* |
5/8" | 1 | $168.35 | $367.42 | $322.68 | $858.45 |
3/4" | 2 | $189.14 | $397.71 | $372.71 | $959.55 |
1" | 3 | $247.98 | $574.69 | $372.71 | $1,195.38 |
1 ½" | 4 | $1,622.12 | $1,622.12 |
Notice: All connections will require Plumbing Permits and Excavation permits. Plumbing permit cost varies and may be obtained by a registered contractor or homeowners occupying their own structure. Excavation permit costs are $85.00 per trench and may be obtained by a Licensed Excavator only.
FLOW RATES
Meter size | GPM | Sewer Deduct Meter (Sprinkler/Pool Filling) | ||
5/8" | 25 | Residential - Cost of the Meter Plumbing Permit $64.00 + 1%BBS Fee = $64.64 | ||
3/4" | 35 | Commercial - Cost of the Meter Plumbing Permit $100 + 3%BBS Fee = $103.00 | ||
1" | 55 | |||
1 ½" | compound | 100 | ||
1 ½" | compound | 200 | ||
2" | 160 | |||
2" | compound | 200 | ||
3" | compound | 500 | ||
4" | compound | 1000 | Account#’s | |
6" | compound | 2000 | Water Tap 612-0000-45271 | |
3" | turbo | 650 | Water Meter 612-0000-45270 | |
4" | turbo | 1250 | Sewer Conne 613-0000-45070 | |
6" | turbo | 2500 | ||
8" | turbo | 3500 | ||
10" | turbo | 5500 | ||
16" | turbo | 10000 | ||
Connection charges shall be increased by three percent (3%) each subsequent calendar year starting on January 1, 2022. Thereafter, this annual Connection Charge increase shall take effect on the first of January each successive year. The City Engineer shall update the rates charged annually to reflect this increase. A current version of the rates charged will be on file in the office of the City Engineer. (Ord. 20-195. Passed 12-28-20.)