(A) Before any grading or excavation is started, the water curb stop box must be located and checked for damage by the contractor.
(B) Location ties will be furnished by the Superintendent at time connection permit is issued.
(C) If the shutoff box can not be located or is found bent or in a damaged condition, the Superintendent is to be called at once.
(D) The contractor assumes all responsibility for damage to the shutoff box unless the Superintendent certifies that damage existed before excavation or grading started.
(Prior Code, § 715.35) Penalty, see § 52.99