§ 163.144 LOT AREA AND SETBACK REQUIREMENTS.
   (A)   Minimum lot width. A lot should not be less than 150 feet in width.
   (B)   Setback requirements. Principal uses must comply with the following setback requirements.
 
Front yard
Minimum of 40 feet
Interior side yard
Minimum of 15 feet
Rear yard
Minimum of 40 feet
Street side yard
Minimum of 40 feet
 
   (C)   Buffer requirements. A building must be set back a minimum of 50 feet from a zoning district boundary line, which separates an industrial district from a residential district. The areas between buildings in the industrial district and such streets and boundaries of any residential district will be utilized as a buffer between the two zoning districts. A vegetative buffer must be planted in this area using native groundcover, shrubs or trees and must be continuously maintained by the industrial district property owner.
   (D)   Road setback. A building must be set back a minimum of 40 feet from any state highway, major or secondary thoroughfare, county highway or any road in use by the public prior to the creation of the industrial district.
   (E)   Lot access. An impervious surface driveway shall be provided from the curb line to the property line of the lot upon which a structure is to be placed or constructed. The driveway may not be less than 12 feet in width.
(Prior Code, § 515.23) (Ord. 02-03, passed 10-16-2002; Ord. 20210120, passed 1-20-2021)