(A) Minimum lot size. With the exception of a lot that is being exclusively used for essential services, a lot in the Prospective Interchange Development District must have a width of not less than 100 feet, and must contain an area of not less than 15,000 square feet.
(B) Other setback requirements. With the exception of structures on a lot that is being exclusively used for essential services, structures must be a minimum ten feet distance from any side yard, rear yard or alley.
(C) Lot access. With the exception of a lot that is being exclusively used for essential services, access to a lot must be from an approved frontage or secondary street. An impervious surface driveway shall be provided from the curb line to the property line of the lot upon which a structure is to be placed or constructed. The driveway may not be less than 12 feet in width.
(D) Minimum transitional yard requirements. With the exception of a lot that is being exclusively used for essential services for each front, side or rear yard in any Prospective Interchange Development District abutting, or abutting except for an intervening alley, a residential district, there must be provided heavily landscaped screening of 80%. Percentages shall be determined by amount of structure that can be seen during leaf-on conditions.
(Prior Code, § 515.19) (Ord. 02-03, passed 10-16-2002; Ord. 20210120, passed 1-20-2021)