Temporary structures shall be erected for a period of less than one hundred eighty (180) days and temporary storage of goods and materials shall be permitted for a period of less than one hundred eighty (180) days. Extensions may be granted in accordance with Section 8.79.230 of this chapter. In addition, the following apply:
A. Temporary structures shall be anchored to prevent flotation, collapse or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during conditions of the design flood. Fully enclosed temporary structures shall have flood openings that are in accordance with ASCE 24 to allow for the automatic entry and exit of flood waters.
B. Temporary stored materials shall not include hazardous materials.
C. The requirements of Section 8.79.560 of this chapter, when located in floodways.
(Ord. MC-1622, 1-17-24)