An inspection shall be requested of DEHS at least 24 hours in advance of:
(a) The filling of the annular space or conductor casing; (Upon failure to notify DEHS, approved geophysical tests including Sonic Log and Gamma Ray Log tests shall be conducted at the owner’s expense to substantiate that an annular seal has been properly installed.)
(b) After installation of the surface protective slab, pumping, and other required equipment;
(c) Immediately before and during the destruction of a well; immediately after the well destruction;
(d) Any other operation or condition stipulated on the DEHS permit.
(Ord. 3105, passed - -1986)