Skip to code content (skip section selection)
Compare to:
§ 23.0726   Modifying and Terminating CUPA UST Permits.
   The Division shall review the permit whenever there has been a release, or when a change in materials stored or the method of monitoring takes place. When it determines that the underground storage tank is not complying with CUPA permit requirements, the Division may modify or terminate the permit. In determining whether to modify or terminate the permit, the Division shall consider:
   (a)   The age of the underground storage tank;
   (b)   The methods of containment;
   (c)   The methods of monitoring;
   (d)   The feasibility of and required repairs;
   (e)   The concentration of the hazardous material or hazardous waste stored in the underground storage tank;
   (f)   The severity of potential releases;
   (g)   The suitability of any other long-term preventive measures that would meet the requirements of this Article;
   (h)   Whether all permit requirements have been met; and
   (i)   Whether monitoring and reporting have been properly carried out.
(Ord. 3846, passed - -2002)