§ 23.09.003 SURVEY REQUIRED.
   (A)   An accurate and complete survey of the land to be subdivided shall be made by a registered civil engineer authorized to practice land surveying in California or licensed land surveyor.
   (B)   At the time of making the survey for the final map, the engineer or surveyor shall set sufficient durable monuments to conform with the standards described in Cal. Business and Professions Code § 8771 so that another engineer or surveyor may readily retrace the survey. At least one exterior boundary line shall be monumented prior to recording the final map. Other monuments shall be set as required by the County Engineer.
(1966 Code, § 17-29) (Ord. 617, § 2(part))