You are viewing an archived code
Review of Inventory Form (Section 1604B.2.1) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Review of the summary of the engineering report (Section 1604B.2.3) | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for a variance from or interpretation of code requirements | Standard Plan Review Hourly Rate - Minimum Two Hours |
Each appeal for the approval of substitute materials or methods of design or construction (Section 105A.7.3) | Standard Plan Review Hourly Rate - Minimum Four Hours |