(A) Drawings. As-built or record drawings of sewer line plans shall be prepared by a professional engineer and the corrected original drawings or a duplicate Mylar copy of the corrected original drawing(s) shall be provided to the city.
(B) Certification by engineer. As-built plans shall include a certification thereon signed by the registered professional engineer in charge of the work that the as-built drawings of the sewer lines are true and correct and that he or she (the registered professional engineer) has inspected the construction of the sewer line installation and that the materials and installation of same were all done in conformance with the city standard specifications for the construction of sanitary sewers and storm sewers.
(Prior Code, § 8-4-34) (Ord. 92-554, passed 10-21-1992)