(A) The Water and Sewer Superintendent will permit the installation of water and/or sewer mains to serve a new real estate subdivision within the corporate limits, which shall be connected to the proper water and/or sewer mains unless this will result in overloading existing mains. In this case, permission for connecting to an existing water and/or sewer main may be denied until such time as the necessary corrective measures are taken.
(B) All new water and/or sewer mains and appurtenances shall meet the specifications adopted as standard by the village for the construction and installation of same, and with any plans or specifications approved by the Water and Sewer Department Superintendent.
(Ord. 863, passed 10-7-2019)