4-3-4: PERMIT AND INSPECTION FEES:
At the time of the application for permit, there shall be paid the following permit and inspection fees:
 
For the permit
$2.00
 
plus, for each fixture
0.25
 
plus, for each building sewer
1.50
 
plus, for each septic tank or cesspool
2.00
 
At the time of renotification for inspection, in the event the previous inspection does not pass the plumbing or plumbing system, there shall be paid a two dollar ($2.00) reinspection fee. (1960 Code, Sec. 3-404)