§ 157.05 PLAN REQUIREMENTS.
   (A)   In accordance with § 157.04, a plan approved by the appropriate agency is required for all development, forest harvesting operations, surface mining operations and agricultural operations.
   (B)   The plan shall set forth an informative, conceptual and schematic representation of the proposed activity by means of maps using a scale of one inch to 100 feet, graphs, charts or other written or drawn documents so as to enable the agency an opportunity to make a reasonably informed decision regarding the proposed activity.
   (C)   The plan shall contain the following information:
      (1)   A location or vicinity map;
      (2)   Field delineated and surveyed streams, springs, seeps, bodies of water and wetlands (including a minimum of 200 feet into adjacent properties);
      (3)   Field delineated and surveyed forest buffers;
      (4)   Limits of the ultimate 100-year floodplain;
      (5)   Hydric soils mapped in accordance with the NRCS soil survey of the site area; and
      (6)   Steep slopes greater than 15% for areas adjacent to and within 100 feet of streams, wetlands or other water bodies.
   (D)   The buffer plan shall be submitted to the City Public Services Director in conjunction with the required grading plan for any development and the riparian buffer should be clearly delineated on the final grading plan.
(Ord. passed 8-13-03)