(B) Specifically.
(1) No encroachments, including fill, new construction, substantial improvements, or new development shall be permitted within a distance of 20 feet each side from top of bank or five times the width of the stream, whichever is greater, unless certification with supporting technical data by a registered professional engineer is provided demonstrating that the encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge.
(2) The BFE used in determining the regulatory flood protection elevation shall be determined based on the following criteria:
(c) All subdivision, manufactured home park and other development proposals shall provide BFE data if development is greater than five acres or has more than 50 lots/manufactured home sites. Such BFE data shall be adopted by reference in accordance with § 150.07 and utilized in implementing this chapter.
(d) When BFE data is not available from a federal, state, or other source as outlined above, the reference level shall be elevated or floodproofed (non-residential) to or above the regulatory flood protection elevation, as defined in § 150.05. All other applicable provisions of § 150.41 shall also apply.
(Ord. passed 2-10-2004; Ord. passed 6-29-2021) Penalty, see § 150.99