(A) Part A. The Village of Romeoville Building Department shall require all necessary testing, test procedures, and inspections as listed and prescribed in the 2021 International Building Code, 2021 International Residential Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, the International Energy Conservation Code, 2021 International Property Maintenance Code, 2014 State of Illinois Plumbing Code, the 2020 National Electrical Code, 2021 International Swimming Pool and Spa Code, 2021 International Existing Building Code and the Illinois Accessibility Code. Additional testing and inspections are listed in Part B. Contact the Building Commissioner for clarity on particular issues as necessary. No exceptions will be made or deviations from the listed required testing, testing procedures, and inspections. Testing reports and inspections shall be submitted to the Romeoville Building Department in a timely matter so as not to hold up the construction process and ultimately the final processing of a certificate of occupancy. All activities including organization and execution of the actual testing and inspection work shall be scheduled by the general contractor or permit holder.
(B) Part B. The Village of Romeoville Building Department also requires tests and inspections listed below in addition to the tests and inspections listed above for electrical, building, mechanical, and plumbing. Electrical inspections are as follows: underground trench raceway inspections, office, warehouse, factory ceiling light fixtures rough and final inspections, new electrical main gear service wiring rough and final inspections, transformer and generator rough and final inspections, parking lot lights and pole bases rough and final inspections, antenna cell towers rough and final inspections, conveyor and pick modular wiring rough and final inspections, furnace, roof top units, and air conditioning units, swimming pool, spas, hot tubs, wiring rough and final inspections, office furniture wiring rough and final inspections, construction trailer inspection, illuminated wall sign inspection, any type of crane wiring rough and final inspections, and any warehouse machinery or equipment. Building inspections are as follows: prepour and final inspections for concrete footings, trenches, foundations, backfill, slabs, driveways, patios, sidewalks, stoops, aprons, walls, floors, and ceiling rough framing and final inspections, ceiling grid inspection, a fire stopping rough inspection, ceiling insulation rough and final inspections, siding, roof, deck, shed, gazebo, arbor, sunroom, three-season room, porch, screened-in porch, and porch rough and final inspections, and warehouse racking inspection. Mechanical inspections are as follows: Rough duct and duct insulation inspection, underground duct in slab inspection, furnace, roof top unit, air conditioning unit, chiller and cooler rough and final inspections, refrigerant piping inspection, commercial type I and II kitchen hoods rough and final inspections, fire dampers rough and final inspections, restroom exhaust fans rough and final inspections, dryer exhaust rough and final duct inspections, commercial kitchen exhaust black iron weld inspection and fire wrap inspection, and battery charging station ducted exhaust inspection. Plumbing inspections are as follows: All underground sewer and water trench rough and final inspections, irrigation rough and final inspections, above ceiling rough and final inspections, eye wash station rough and final inspections, and gas piping rough and final inspections. This list is not all inclusive. Any other inspections deemed necessary for code compliance shall be determined by the Building Commissioner.
(C) Part C. The Village of Romeoville Building Commissioner, or his/her designee, reserves the right to require other tests, testing procedures or inspections as he/she sees fit to meet the special needs or unique complexity of a specific construction project. All general contractors, sub-contractors, or concerned parties are strongly advised to contact the Building Commissioner to explore the potential need for additional testing and inspection requirements. Failure to contact the Building Commissioner concerning specifics on additional testing or inspections will result in the inability of the Village of Romeoville Building Department's final closing of the construction permit process and preventing occupancy.
(Ord. 11-0923, passed 9-21-11; Am. Ord. 17-1347, passed 3-1-17; Am. Ord. 22-1812, passed 12-7-22)