§ 152.204 POSITIVE DRAINAGE.
   (A)   All developments must be provided an overland flow path that will pass the 100-year, 24-hour flow within designated drainage easements or the public right-of-way with a freeboard of at least one foot.
   (B)   Overland flow paths shall be provided drainage easements unless the flow is contained in the public right-of-way.
(Ord. passed - -)