6-7-11: PERMIT REQUIRED:
A building permit shall be required for the installation of any radio amplification system. The fee for the permit shall be the minimum permit fee as established by the building permit fee schedule set forth in section 4-1-4 of this Code. (Ord. 3018, 6-20-2019)