6-7-4: ANNUAL TEST:
When an in-building or structure radio amplification system is installed, the property owner shall, at the owner's sole cost and expense, test all active components of the radio amplification system including, but not limited to the amplifier, the power supplies and the back-up batteries, a minimum of once every twelve (12) months. Amplifiers shall be tested to ensure that the gain is the same as it was upon initial installation and acceptance of the radio amplification system. Back-up batteries and power supplies shall be tested under load for a period of one hour to verify that they will operate during an actual power outage. All other active components shall be checked to determine that they are operating within the manufacturer's specification for the intended purpose. (Ord. 3018, 6-20-2019)