A. | Fees for petitions and licenses shall be as follows: | |||
1. | Petition request for a PRUD | $500.00 | ||
2. | Conditional use permit | 75.00 | ||
3. | Filing fee for an appeal to the City Appeal Authority Appeal filing gees will be refunded to the party if the party fully prevails at the appeal hearing. | 400.00 | ||
4. | Filing fee for a mobile home park construction permit | 1,000.00 | ||
5. | Filing fee for a petition to change the zone of any property | 350.00 | ||
B. | Fees for submitting a site plan to the Planning Commission shall be as follows: | |||
1. | Commercial or Manufacturing Zone (per acre or portion of) | $400.00 | ||
2. | Vending cart in Commercial or Manufacturing Zone (per acre or portion of) | 200.00 | ||
3. | Commercial subdivision site plan (per lot/unit) | 200.00 | ||
4. | Residential subdivision site plan (per lot/unit) | 150.00 | ||
C. | Where submitted building plans are found to be substantially identical to plans reviewed by the building official any time within 1 year prior to the date of submission of such substantially identical plans, the plan review fees shall be 25 percent of building permit fee. | |||
D. | Water connection fees shall be as follows: | |||
1. | Water connection (per inch line size) | $200.00 | ||
2. | Water connection for commercial fire prevention sprinkling systems (per inch diameter) | 200.00 | ||
E. | Sewer installation fees and sewer lateral connection fees shall be as follows: | |||
1. | Sewer hookup fee (main line) | $250.00 | ||
2. | Residential (per lot) | 300.00 | ||
3. | Commercial | 500.00 | ||
There shall be an additional $15.00 charge per foot of property frontage over 80 feet for residential and commercial lots. | ||||
For commercial properties with narrow frontage or other special circumstances associated to lot size or use, the City Council may determine the appropriate lateral connection fee. | ||||
F. Fee for engineer review of development/construction plans submitted to the Community Development Department shall be as follows:
Any individual or development company that submits a site plan and/or engineering calculations for review by the Riverdale City Engineer is responsible for payment of review costs associated with each submittal and review or reviews.
G. Public Works Department engineering cost reimbursement:
Any individual or development company's development project that requires review and/or inspection of the Riverdale City Engineer shall pay for the review and/or inspection cost associated with said review and/or inspection to Riverdale City.
H. | Building and sign permit fee: | ||||
1. | Building permit fee for new construction is based on actual valuation. Valuation is the cost of code regulated construction materials and the costs for labor. | ||||
2. | Building permit fee for remodel, addition, or interior finish are based on actual valuation of materials and labor necessary to complete the job in compliance with applicable codes. The following are guidelines to follow for establishing valuation: | ||||
Living area, basement (unfinished), and garage | Same as that amount adopted by the current International Code Council (ICC) building valuation data | ||||
3. | Minimum building and sign permit fee | $48.36 | |||
4. | Permit fee for all signs shall be based on 1/2 the actual value of the sign, including the cost of installation. | ||||
5. | The following are specific prescribed permit fees: | ||||
Water heater installation | 48.36 | ||||
Furnace/AC installation | 48.36 | ||||
Reroof (shingle removal) | 48.36 | ||||
Power clearance | 48.36 | ||||
Water/sewer laterals | 48.36 | ||||
Mobile home setting | 81.30 | ||||
Replacement of exterior siding, stucco or windows | 48.36 | ||||
Residential solar panel installation | 48.36 | ||||
Commercial solar panel installation | Based on valuation (see subsection H1 of this section) | ||||
6. | All permit fees shall include a one percent (1%) State surcharge and a five percent (5%) city processing fee.
| ||||
7. | Re-inspection fee | $65.00 | |||
8. | Development Review Fee
| ||||
Residential (per lot)
| $150.00
| ||||
Commercial (per acre)
| 300.00
| ||||
9.
| For use of outside consultants for plan checking and inspections or both | Actual costs including reasonable administrative and overhead costs | |||
10.
| See schedule A attached to Resolution 2012-10 for all other building and sign permit fees. | ||||
(Res. 2015-19, 6-16-2015; amd. Res. 2017-25, 10-17-2017, eff. 10-17-2017; Res. 2019-19, 7-16-2019; Res. 2021-18, 6-15-2021)