§ 153.328 UTILITIES AND IMPACT FEES.
   (A)   Utility service. Adequate roadways, public utilities and services shall be available to serve the ADU. ADUs shall not be considered new residential uses for the purposes of calculating connection fees or capacity charges for sewer and water. Installation of a separate direct connection between an ADU contained within an existing structure and the utility shall not be required. ADUs not within an existing structure shall be required to install a new or separate utility connection and be charged a connection fee and/or capacity charge. These charges shall be proportionate to the burden imposed by the ADU on the water or sewer system based on either its size or number of plumbing fixtures as determined by the city.
   (B)   Impact fees. Impact fees charged for the construction of ADUs shall be consistent with Cal. Gov't Code § 65852.2(f).
(Ord. 2021-007, passed 12-14-21)