8-2-43: “AS BUILT” DRAWINGS AND ENGINEER’S CERTIFICATION:
   A.   "As built" or "record" drawings of sewer line plans shall be prepared by a professional engineer and the "corrected" original drawings or a duplicate Mylar copy of the "corrected" original drawing(s) shall be provided to the City.
   B.   "As built" plans shall be stamped and signed by the registered professional engineer in charge of the work that the "as built" drawings of the sewer lines are true and correct and that he (the registered professional engineer) has inspected the construction of the sewer line installation and that the materials and installation of same were all done in conformance with City "Standard Specifications for The Construction Of Sanitary Sewers And Storm Sewers." (Ord. 543, 5-5-2009; amd. Ord. 2021-621, 9-2-2021)